Pricing

Studies start at $495.

Most residential studies are between $495 and $995; commercial starts at $1,995. One flat fee per study — the price you see at checkout is the price. CPA-Ready Guarantee on every study, delivered in under one hour.

No hidden fees CPA-Ready Guarantee Under 1 hour delivery 40+ page IRS-defensible PDF
412 engineered analyses · 43 states · Audit defense for life of study.
Beachfront short-term rental homes in Gulf Shores, Alabama
Residential
SFR · STR · Condo
Example study
$695K STR · Gulf Shores AL
3-bed beachfront, furnished
Study fee
$895
Year-1 savings
$28,000–$58,000

Furnished-STR FF&E uplift on personal property. Form 3115 lookback if you've held it >1 year.

See full pricing matrix
Modern multifamily apartment building exterior with balconies
Small Commercial
MF 5+ · Office · Retail · Mixed-Use · Industrial / Warehouse
Example study
$3.2M 12-unit apartment · Austin TX
Stabilized 2019 build
Study fee
$5,995
Year-1 savings
$95,000–$215,000

Standard commercial methodology. industry-standard 2026 construction cost basis, BLS PPI time index, IRS Pub. 5653 alignment. On-site property survey & engineering review included on $3M+ commercial. Hospitality and manufacturing are scoped per-property — see below.

See full pricing matrix

Examples are illustrative. Actual savings depend on property specifics, holding period, and tax position. Ranges are grounded in our analysis of 412 cost segregation studies.

How we got here

Why the price is this low.

Most traditional firms spend their engagement time on sales calls, on-site visits, and manual report assembly. We automated that layer — not the underlying engineering methodology.

Same industry-standard 2026 construction cost basis, same MACRS classification per Rev. Proc. 87-56, same IRS Pub. 5653 framework. Same 40+ page CPA-ready PDF, internal technical review & QC, 36-month audit defense.

See the line-item comparison vs a $5K firm's report →  ·  Head-to-head provider comparison →

Estimate first

Estimate your savings before you decide.

Tier pricing depends on purchase price. Run your numbers — most STR owners see $40K–$120K reclassified in Year 1.

Estimated Year-1 tax savings · Click to order →
$41,440
on $112,000 of accelerated deductions
Want this in writing for your CPA? Get a 1-page analysis →
5-yr15-yr27.5/39-yr
Study cost
$895
ROI on study
46×
Delivery
< 1 hour
Order my study — $895
Estimate based on industry-standard 2026 construction cost data and IRC §168(k). Your actual result varies with property age, condition, and basis allocation.
Full pricing matrix

Find your exact price by property type.

How our pricing works: fees are keyed to purchase price and published explicitly — no "request a quote" wall. Residential starts at the $495 wedge and stays gentle; the revenue step-ups are on the equipment-heavy commercial verticals. Every study is the same engineering method as the $5,000–$15,000 traditional firms, typically 30–60% less, delivered in about an hour.

The sections below — Residential, Standard Commercial, Enhanced / Equipment-Heavy (self-storage, car wash), Specialty (hospitality, manufacturing), and Data Center — make up the complete fee schedule. Partners get a flat 20% wholesale discount. $25M+ properties and the by-proposal types route to a custom-scoped engagement; contact support@costsegsmart.com.

Residential matrix · SFR · STR · Condo · MF 2–4 12 price bands

Pick your property type or price band to start — the order page pre-fills automatically.

Property type <$300K$300K–$700K$700K–$1M$1M–$1.5M$1.5M–$2M$2M–$3M$3M–$4M$4M–$6M$6M–$8M$8M–$10M$10M–$25M$25M+ — custom proposal
Single-family / STR / Condo
1 unit residential
$495 $895 $995 $1,295 $1,595 $1,995 $2,495 $3,995 $5,995 $7,995 $10,995 By proposal
Multifamily 2–4
Duplex, triplex, fourplex
$795 $995 $1,095 $1,595 $1,895 $2,295 $2,795 $4,495 $6,495 $8,495 $11,995 By proposal

Complex cases priced separately. Reverse §1031 exchanges, improvement exchanges, trust or partnership ownership where land and basis allocation require entity coordination, and luxury estates may require proposal pricing regardless of basis tier. We'll let you know at intake.

Commercial matrix · MF 5+ · Office · Retail · Industrial · Mixed-Use · Restaurant · Medical Office 7 price bands · Property survey & engineering review at $3M+

Pick your property type or price band to start — the order page pre-fills automatically.

Property type <$1M$1M–$3M$3M–$5M$5M–$7M$7M–$10M$10M–$25M$25M+
Office · Retail · Mixed-Use
$1,995 $3,295 $4,995 $6,295 $7,795 $10,995 By proposal
Medical / Dental · Restaurant · Fitness · Auto · Vet
$2,495 $3,995 $6,295 $7,995 $9,795 $13,995 By proposal
Multifamily 5+ MF 5+ at $3M+ has its own tier because engineering scope scales with unit count: multi-tenant cost allocations, common-area depreciation, and shared mechanical systems (boilers, chillers, elevators) all add complexity that a 12-unit garden apartment doesn't share with a single-tenant office.
Apartment buildings, syndications
$1,995 $3,595 $5,995 $7,995 $10,495 $14,995 By proposal
Industrial / Warehouse Industrial / Warehouse studies carry a premium over Standard Commercial because of heavier MEP (three-phase electrical, dock equipment, dust collection), larger site improvements (paving, fencing, retention), and broader 15-year land improvement allocations. Manufacturing-heavy or specialty industrial is scoped per-property — see "Specialty Commercial" below.
Standard warehouse, light industrial, distribution
$2,495 $3,995 $6,295 $7,995 $9,795 $13,995 By proposal
Hospitality · Manufacturing · Data Center
By proposal By proposal By proposal By proposal By proposal By proposal By proposal
Property survey & engineering review
On-site engineering-grade asset walkthrough
Included Included Included Included Included

"By proposal" means the engagement is scoped per-property — see below for the full explanation. Dashes indicate tiers not offered for that property type. Property survey & engineering review: on-site engineering walkthrough + asset capture included for $3M+ commercial — it's the added scope behind the $3M+ pricing step, not required for IRS compliance below that threshold.

Enhanced / Equipment-Heavy · Self Storage · Car Wash Equipment + site dominate the basis

Their own explicit tables — documented equipment allocations produce the strongest result. Larger sites / portfolios are by proposal.

Property type <$1M$1M–$2M$2M–$4M$4M–$7M$7M–$15M$15M+ — custom proposal
Self Storage
Drive-up + climate-controlled
$2,495 $3,995 $5,995 $7,995 $10,995 By proposal
Car Wash
Express tunnel · in-bay · self-serve
$2,995 $4,995 $7,995 $9,995 By proposal By proposal

Car wash is in a calibration phase — every car-wash study is reviewed before delivery.

Specialty

Hospitality & manufacturing

Hotels and manufacturing vary widely in complexity, so these are scoped per-engagement — but here's what to expect.

Hospitality (hotel / motel)
< $3M$5,995
$3M – $7M$8,995
$7M – $15M$12,995
> $15MBy proposal

Indicative; hotels with pools, restaurants, large FF&E, or PIP history are reviewed before delivery.

Manufacturing / specialty industrial

Custom engagement — typically $7,000–$30,000+ depending on process equipment and MEP density. Request a proposal →

Data Center cost segregation

Data center pricing ladder

Data center engineering scales harder with basis than standard commercial — cooling architecture, redundancy tier, MEP density — so we publish a granular ladder to price the $10M+ tiers accurately. Full methodology + ICP segments →

Basis Study fee
< $1M basis$4,995
$1M – $3M basis$6,995
$3M – $5M basis$11,995
$5M – $7M basis$15,995
$7M – $10M basis$19,995
$10M – $15M basis (small colocation / enterprise)$24,995
$15M – $25M basis (mid-tier colocation / large enterprise)$29,995
$25M – $40M basis$34,995
$40M – $60M basis$42,995
$60M – $100M basis (large colocation / hyperscale)$54,995
$100M+ basisBy proposal

Data center pricing is driven primarily by system complexity — UPS, generators, cooling architecture, redundancy tier (III/IV), and tenant configuration — not just project cost. A multi-tenant Tier III DC has 2–3× the major MEP systems of a single-tenant Tier II at the same basis; §481(a) lookback complexity and documentation availability factor in as well. Full drivers →

Custom-scoped engagement

Specialty Commercial engagements

Hospitality, manufacturing, and data center work is scoped per-property based on engineering complexity, specialty MEP systems, site improvements, and entity-structure coordination. We scope per-property, not per-tier. Standard industrial / warehouse studies stay matrix-priced — only manufacturing-heavy, specialty industrial, and data center route here. For data centers specifically: indicative pricing is published across the full ladder from $4,995 up to $54,995 for sub-$100M basis (edge, colocation, enterprise, and large colocation / lower hyperscale). $100M+ campus basis is by proposal, scoped per-property based on system count, redundancy tier, and tenant structure.

Email scoping@costsegsmart.com with the property details — we’ll send a scoped engagement quote within one business day.

Request scoping →
vs the alternatives

Traditional firms quote $5K–$15K. For straightforward residential, that's pricing scope — not quality.

Same industry-standard 2026 construction cost basis. Same MACRS framework. Same IRS Audit Techniques Guide methodology. Different delivery model.

Cost Seg Smart Automated, residential + small commercial
$495 – $14,995
Under 1 hour · 40+ page CPA-ready PDF · Money-back if your CPA can't use it
Traditional firm
$5,000 – $15,000
4–8 weeks · Discovery call · On-site engineer visit · Right fit for complex commercial >$5M
DIY software
$499 – $2,999
Self-paced · Usually summary-level · Not engineering-based by default
Two ways forward

Order your study, or see one first.

Studies start at $495 and ship in under an hour. If you want to evaluate the deliverable before paying, download a real (anonymized) report — no signup beyond email.

Order my study Download sample report CPA-Ready Guarantee · Money-back if not used
Pricing questions

What people ask before they order.

Why are your studies so much cheaper than traditional firms? +

Traditional firms quote $5,000–$15,000 because each engagement is hand-built: discovery calls, on-site engineering visits, custom report writing. For a typical residential rental, those steps add weeks without changing the answer. Our engine applies the same industry-standard 2026 construction cost basis and IRS Audit Techniques Guide methodology — but the workflow is automated, so we ship the same defensible study at a fraction of the cost. See a side-by-side of what's in a <a href="/cheap-cost-segregation/">cheap cost segregation study</a> vs a $5K firm's study.

What does the price include? +

Everything you need to file: a 40+ page CPA-ready PDF, component-level depreciation schedules, MACRS class allocations, basis reconciliation, land valuation methodology, and Form 3115 readiness for prior-year lookback. Delivered via email in under one hour. No upsells, no per-revision fees.

Are there any hidden fees? +

No. The price you see at checkout is the price. We do not charge separately for revisions if your CPA requests format changes — that's covered by our CPA-Ready Guarantee. The only optional add-on is rush handling on weekends, and we'll tell you upfront before you pay.

What if my CPA can't use the report? +

Our CPA-Ready Guarantee: if your CPA requests changes to format, documentation, or classification questions, we'll revise within 30 days. If a question is technical, we'll set up a brief call between our technical team and your CPA to walk through the methodology — every classification ties back to IRS Pub 5653 and Rev. Proc. 87-56. If we can't resolve their concerns, we refund the study fee in full. Not covered: changes you make to the property facts after delivery (e.g., adding a major renovation we weren't told about), or audit outcomes — those depend on facts and representations beyond the study itself.

Do you offer bulk pricing for portfolios? +

Yes. Order 2 together for 5% off, 3–4 for 10%, and 5–9 for 15% off retail per study; 10+ qualifies for portfolio pricing — email us. For partners reselling to their book of business, wholesale is a flat 20% below retail (first study free). Email support@costsegsmart.com with your portfolio details.

Why are specialty commercial properties priced separately? +

Engineering complexity, specialty MEP, site improvements, and entity coordination vary widely across medical, restaurant, hospitality, and manufacturing-heavy industrial properties. We scope each engagement individually rather than forcing the work into a tier that under- or over-prices it. Standard industrial / warehouse stays matrix-priced — only manufacturing and specialty industrial route to scoping. Tell us about the property at /order/ and we'll send a quote within one business day.

Two ways in

Run the math, or order the study.

From $495 · CPA-ready · money-back if your CPA can't use it.